May
16
The first 2 containers that arrived in port now have made it to the construction site and are being placed on their concrete foundations. Since these are 1.6 MW HFO Generators, by the end of the day 3.2 MW of electricity generating potential is in place and waiting.
- Truck in position
- Set it on the pad
- It’s down
- #2 in position
- Ready to lift
- Move the truck
- Set it down
- Perfect aim
- Almost home
- 3.2 MW of power
- Ready for more