We’re on a roll now. HFO Generators 3 and 4 have arrived on-site, bringing the total electricity generation capacity to 6.4 MW. Supporting equipment is starting to arrive as well. The HFO Purifying container was also placed onto its pad yesterday.
- #3 coming in
- #3 done
- #4 pulling into position
- Hook up the crane
- Right on target
- Unhook
- 6.4 MW of power